  • Geological exploration of the «YUZHNIY GOK» part of the Skeliuvatske deposit began.
  • Geological prospectors began drilling wells 150 to 330 meters deep.
  • On the basis of a resolution of the Council of Ministers of the USSR, the Ministry of Ferrous Metallurgy decided to build the «YUZHNIY GOK» Mining and Processing Plant.
  • The Ministry of Ferrous Metallurgy approved the project task.
  • «Hyproruda» Institute (city of Kharkiv) developed the project of the «YUZHNIY GOK» Mining and Processing Plant.
  • Geodesists and surveyors drove into the ground the first wooden pegs, which determined the exact contours of the future quarry, factories, shops and neighboring microdistrict, which were to grow on the site of the Kryvyi Rih steppe.
  • Pavel Bilyi was appointed director of the enterprise under construction.
  • Excavator driver Anton Kovaliov tested the first SE-3 excavator assembled in the quarry.
  • Mining surveyor Vasyl Kupyn planned a route for the quarry excavation on the horizon of +70 meters.
  • The excavator driver Ivan Prokopenko loaded the first bucket of overburden to the road transportation vehicle.
  • Excavator No.1 loaded the first cubic meters of the overburden onto road transport. This was the official start of the «YUZHNIY GOK» Mining and Processing Plant mine.
  • The locomotive driver Vasylii Lavreniuk drove out the first spinner of overburden.
  • Drivers of rope and percussion drilling machines Vladymyr Kiiashko, Nikolay Burlachenko, Andrey Hrebeniuk drilled the first wells.
  • 7 million 126 thousand cubic meters of rock mass were dispatched. 12 units of SE-3 excavators were in operation.
  • Laboratory assistant Elena Balakina made the first analytical test of the ore.
  • The first electric locomotive spinner driven by motorman Vladymyr Vashchenko was launched.
  • The driver of the electric locomotive Anatolii Fedorov took out the first spinner of ore, and the cargo was received by the driver of the “1500” crusher Roman Shalahin.
  • Launch of the first phase of the «YUZHNIY GOK» Mining and Processing Plant. The first 10 tons of concentrate were obtained at the 8th section of the Ore Beneficiation Plant during the shift of Yurii Khvatov.
  • The first ton of concentrate was produced by the sinter plant of the «YUZHNIY GOK» Mining and Processing Plant.
  • A catenary service has been established to service the quarry’s power supply networks. The first line of electric traction in the railway workshop was introduced.
  • Excavator driver Valentyn Myronenko shipped 2,000 cubic meters of overburden in one shift. This was the first mining record.
  • Agglomerators produced the first million tons of concentrate.
  • The sinter plant produced the second million tons of fluxed concentrate.
  • The Palace of Culture of the «YUZHNIY GOK» Mining and Processing Plant was opened. On the opening day of the Palace of Culture, the first concert of amateur artists was held.
  • Ivan Savitskyi took over the position of director of the «YUZHNIY GOK» Mining and Processing Plant.
  • The park of culture and the stadium of the «YUZHNIY GOK» Mining and Processing Plant were opened.
  • At the «YUZHNIY GOK» Mining and Processing Plant, the first experimental and industrial assembly for the sintering of iron concentrates was tested.
  • For the first time in Kryvyi Rih Iron Ore Basin, stone casting was used at the «YUZHNIY GOK» Mining and Processing Plant.
  • By the Decree of the Presidium of The Supreme Council, the director of the plant Ivan Savytskyi was awarded the title of Hero of Socialist Labor.
  • The crew under leadership of excavator driver Valentyn Myronenko set a record for passing the exit trench for railway transport in 2 months and 20 days instead of the 6 months planned for this kind of work.
  • Start-up of the second phase of the plant with an annual capacity of 9 million tons of ore and 5 million tons of concentrate.
  • Fire drilling machines were put into operation in the quarry, which were meant to replace the rope and percussion drilling machines.
  • Polyclinic of the «YUZHNIY GOK» Mining and Processing Plant opened its doors to visitors.
  • To improve the quality of the concentrate at the plant, a multi-stage beneficiation scheme was developed without the installation of additional equipment.
  • The first short-delay blasting with a volume of detonated explosives of 50 tons was carried out.
  • The brigade of Valentyn Myronenko shipped 1 million 207 thousand cubic meters which is more than 4 million tons of rock mass in one year. These workers became the first “millionaire” excavator drivers in the country.
  • Excavator foreman Valentyn Myronenko was awarded the title of Hero of Socialist Labor.
  • For the achievements in the implementation of the seven-year economic plan, the collective of the «YUZHNIY GOK» Mining and Processing Plant was awarded the Order of the Red Banner of Labor.
  • A large-scale short-delay blast using 1,250 tons of explosives was carried out in the quarry. Specialists from Russia, Kazakhstan, Azerbaijan, and Tajikistan came to the «YUZHNIY GOK» Mining and Processing Plant to study this advanced practice. In the same year, the last percussion rope drilling rig was decommissioned from the quarry.
  • The radon department of the 11th City Hospital was opened.
  • Excavator driver Nikolay Emelianov was awarded the title of Hero of Socialist Labor.
  • The million ton level of rock mass load was reached and exceeded by 17 out of 32 excavation crews.
  • Two billion tons of iron ore have been mined at the «YUZHNIY GOK» Mining and Processing Plant since the beginning of mining operations in the Kryvyi Rih Iron Ore Basin.
  • A 7-year project of reconstruction and technical re-equipment of sections has been launched at the beneficiation plants, which was titled “Reconstruction without production losses”.
  • The commissioning of cyclic-flow technology on the horizon of -90 meters allowed to increase ore production to 34 million tons.
  • A new technology for preparing horizons in the quarry was introduced.
  • A decision was made to introduce BelAZ dump trucks with a capacity of 110 tons into the quarry.
  • After the completion of works on the construction of the diversion channel of the Inhulets riverbed, conditions were created for deconservation of 224 million tons of ore and intensive development of the north-eastern side of the quarry.
  • The highest annual indicators have been achieved since the beginning of the deposit development. The workers of the «YUZHNIY GOK» Mining and Processing Plant mined a record 35.615 million tons of ore, and produced a record 8.5 million tons of sinter. Ore Beneficiation Plant RZF-1 produced a record 7.343 million tons of concentrate.
  • «YUZHNIY GOK» Mining and Processing Plant was transformed into a leased enterprise.
  • Instead of obsolete machines, modern excavators EKG-8I, EKG-10, EKG-6.3 US and SBK-400 drilling rigs were put into operation.
  • The meat processing complex is put into operation.
  • On December 29, 1994, the leased enterprise was transformed into the Open Joint-Stock Company «YUZHNIY GOK».
  • The construction of a complex of cyclic-flow technology of rock stripping on the horizon -75 meters was completed, which made it possible to unload the internal railway tracks and reduce the distance of transportation of overburden.
  • «YUZHNIY GOK» Mining and Processing Plant Iron Ore Concentrate received an international award for the best brand and a certificate from the Trade Leaders Club (Madrid, Spain).
  • Works were begun on the reconstruction of the existing mining transportation scheme for the introduction of heavy vehicles below the horizon -210 meters for the transportation of ore and waste rock.
  • The long-term strategic program of the plant development was started. The project was designed for a 10-year period. The result was an increase in ore production by 76%, and by 71% in production of iron ore concentrate.
  • 1 billion 400 million tons of ore were mined since the beginning of the «YUZHNIY GOK» Mining and Processing Plant quarry.
  • «YUZHNIY GOK» Mining and Processing Plant started implementing a program of comprehensive improvement of the housing estate of the enterprise.
  • By the Decree of the President of Ukraine, Mykhail Korolenko, Chairman of the Board of OJSC «YUZHNIY GOK», was awarded the title of Hero of Ukraine and the Order of the State.
  • Konstantyn Fedin was appointed Chairman of the Board of the «YUZHNIY GOK» Mining and Processing Plant.
  • The 1st and the 2nd phases of the complex of cyclic-flow technology on the horizon -210 meters were put into operation.
  • The plant purchased a HITACHI excavator with a bucket volume of 15.5 cubic meters, reconstructed the warehouses of the production preparation and warehousing workshop, opened the Museum of Labor Glory, and repaired the facades of houses in the Matrionivka residential area.
  • «YUZHNIY GOK» Mining and Processing Plant invested UAH 330 million in the overhaul of the fifth and sixth sections of the Ore Beneficiation Plant No.1.
  • On March 11, 2016, the plant reached the level of 1 billion 500 million tons of extracted ore since the start of operation of the quarry.
  • The overhaul of two sections of the ore beneficiation plant No.1 was completed at the «YUZHNIY GOK» Mining and Processing Plant. The seventh section and – at the end of October – the eighth section of the Ore Beneficiation Plant were put into operation. The total investment in modernization amounted to about UAH 400 million.
  • The largest investment program in recent years is being implemented. About 2 billion hryvnias were spent on equipment upgrades and overhauls. The overhaul of two sections of the Ore Beneficiation Plant No.1 was completed; the seventh and eighth technological sections were put into operation.
  • Limited Liability Company «YUZHNIY GOK» was transformed into Joint Stock Company «YUZHNIY GOK».
  • It was decided to close the sinter production.
  • The construction of the first slurry thickening complex in Ukraine was completed.
  • The approved volume of investments in the development of the plant amounted to more than five billion hryvnias.
  • Dismantling of buildings and structures of the sinter plant was started.
  • Two technological sections of the first Ore Beneficiation Plant were overhauled.
  • The volume of iron ore concentrate production reached 13 million 500 thousand tons.

«YUZHNIY GOK» Mining and Processing Plant is the number one enterprise in the Eastern European countries in the field of open-pit mining and beneficiation of low-iron magnetite quartzites aimed at obtaining iron ore concentrate and blast furnace sinter.

The plant was built in a very short time. In 1952 the project task was approved, and on July 27, 1955 the first ton of concentrate was produced (and in 2 months the first ton of sinter was obtained).

The annual productivity reached by the first phase of the plant amounted to: 9 million tons of raw ore; 4 million and 446 thousand tons of concentrate; and 2 million 625 thousand tons of sinter, respectively. In 1961, the second stage of the plant was put into operation.

The labor collective of the «YUZHNIY GOK» Mining and Processing Plant were fortunate enough to become pioneers in the scale of the entire mining industry of the country. With their work and perseverance they were able to prove the viability of many scientific developments, to master technologies and test new mining and processing equipment, which yesterday lived only within the imagination of engineers and designers.

There were no similar enterprises in Eastern Europe. So the «YUZHNIY GOK» Mining and Processing Plant became an experimental industrial site, where the skills of drilling and blasting, as well as the ore beneficiation technology were honed with jewelry precision. Over the years, the experience of the «YUZHNIY GOK» Mining and Processing Plant has become indispensable in the commissioning of related companies across the country.

It was at the «YUZHNIY GOK» Mining and Processing Plant where for the first time in the USSR fire and cone drilling machines were used in the quarry, short-delay blasting during mass explosions was introduced, a multi-stage magnetite quartzite beneficiation scheme was mastered, the first industrial tests of enriched oxidized ores were conducted, and also the schematic diagram of production of iron ore pellets was worked out.

«YUZHNIY GOK» Mining and Processing Plant has truly become a forge of highly qualified personnel. Specialists of the enterprise later “leveled up” other mining and processing plants of Kryvyi Rih built in the 1960s, held senior positions at other industrial enterprises and also in the state apparatus of the country.

Over the past six decades, the laborers of the «YUZHNIY GOK» Mining and Processing Plant have had to go through different times – from record production levels in the 1980s, to a huge decline in production in the 1990s and its stabilization in the 2000s.

Today the company has a period of ascent again. Long-term investment program and social projects being implemented currently give reasons to talk about the «YUZHNIY GOK» Mining and Processing Plant as a successful, modern and socially oriented enterprise. In particular, thanks to the company’s social investments, the residential area of the «YUZHNIY GOK» Mining and Processing Plant is now one of the most cozy and picturesque corners of Kryvyi Rih.

История История История